Rosseti Lenenergo specialists allocated 770 kilowatts of power to a new school in the Krasnoselsky district of St. Petersburg. There are 550 children studying in the public education institution. This was stated in the company’s press service.
“This modern three-story school, designed to accommodate 550 students, will operate on a full-day school model; various educational clubs have been set up for children,” Electric Grid Company representatives noted.
The main source of power supply was a substation designed for 110 kW. As part of the work, power engineers designed, built and equipped a complete block-type transformer substation. In addition, specialists installed a new electrical transformer and laid power lines, according to reports.Petersburg memoirsยป.
Previously, Rosseti Lenenergo specialists allocated 150 kilowatts of additional power to industrial buildings. It is located in the urban settlement of Fedorovsky, Tusninsky district, Leningrad region.
https://cablefreetv.org